9/9/2023 0 Comments Logan township nj crown point![]() Delaware lost the lawsuit in a Federal court ruling. ![]() Delaware opposed the project and filed a lawsuit in federal court to stop the project from going forward on the basis that they control the waters in which part of the pier would be situated. The facility would have included a long off-loading pier that technically would have entered the State of Delaware's waters, because the Delaware River within the Twelve-Mile Circle is all in Delaware, up to the mean low water mark on the New Jersey side. Company president Godon Shearer cited "significant increases in natural gas production from North American shale resources," and that impact on prices and demand, as the reason for halting the project. On January 6, 2012, Crown Landing LLC's owner, Hess Energy, filed a letter to the Federal Energy Regulatory Commission (FERC) surrendering the authorization to construct and operate, due to the likelihood that the terminal would not be profitable. Once the LNG was processed into natural gas, it would have been transmitted throughout the Mid Atlantic and Northeastern United States via a number of interconnections with existing natural gas pipelines that are located near the proposed terminal. The new facility would have been one of 14 LNG off-loading and processing facilities in the United States, and would have allowed for the importation of LNG from anywhere in the world. A liquefied natural gas (LNG) off-loading and processing facility called the Crown Landing LNG Terminal was proposed in Logan Township, New Jersey on a 175-acre (71 ha) site along the Delaware River.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |